Trying to create a fancy email with status reports from multiple teams
I'm trying to go a bit above and beyond, using SmartSheets to track the status of multiple projects across multiple teams. Currently, we have links to multiple sheets (one for each team) and they manually go in, add a new column per week, and fill it in with a bunch of text explaining the status of that project this week.
What I'd like to do is:
1) Build a sheet/report that consolidates all of these different sheets on a weekly basis. For example, I would add a 9/14/15 column (after the 9/7/15 column) on each sheet, the teams fill this in, and then on this master sheet that runs in the evening, it would only have the latest column of information.
2) Build a nice-looking email that is sent out to multiple people, using the data in this master sheet. Something that looks like a newsletter, where I can customize how the cell contents are displayed, and the email is built by going line by line. Ideally, I could even include hierarchy here.
我一直在尝试解决方法;我看到at I can export to google sheets, for example. I was hoping to build out an email format in google using their scripting system, then automate an export to that document and have it process a job, but it looks like I need to manually export each time, *and* it creates a new google sheet each time.
I've tried creating both Reports and Parent Sheets, but each one has a few restrictions that prevent this from happening. For example, Reports have no hierarchy, but will import any number of rows based on criteria provided. A parent sheet has custom hierarchy, but will ONLY pull data cell by cell, which means if any team adds a new project, I'd need to manually add it in and re-do the layout of the parent sheet each time.
The closest I've gotten so far:
* Create a report that brings in data from each sheet
* Create a google sheet script that goes line by line and builds a nice-looking email (or uses one from a google doc)
* Each week, manually update the column to be pulled into the report
* Manually export the report to google sheets
* Make sure the new sheet is connected to the google script (Haven't done this yet, so not sure how easy this is)
* Run the script in google to send out the email
Things that would be REALLY helpful:
* The ability to do all of this within smartsheets
* Create a link between google sheets and smartsheets to update a google sheet rather than create a new one
* Automate/schedule the update between the two
* Select a column INDEX rather than just by name (That way, every time I add a new column, I always want to grab column F, since column F will now be the new date, and the old one will now be column G)
Am I missing anything? Has anyone done something snazzy to this effect?
Comments
-
JohnHinkle ✭✭✭✭✭✭
I would look into Zapier. Zapier uses Smartsheet's API to perform automated actions. You could, for example...
-Connect Smartsheet and Gmail together
-Build a Zap with a trigger (maybe a checkbox)
-When the box is checked, Zapier can take data from the row and add it to an email
-Send the email to a specific email address or an email address listed in the row
You can build the email as you would in Gmail, but you have the options to add text from any column field from the row, anywhere in the email. For example:
"Hi, here is the status of *SheetName*
*TaskName* was completed on *DateCompleted* by *AssignedTo*. "
看看zapier.comto set this up!
Categories
I hope you're well and safe!<\/p>
I can't see any rows in your screenshot that should be colored differently. Parent rows can't be changed.<\/p>
Can you share more screenshots with the conditional formatting options used on a few child rows?<\/strong> (Delete\/replace any confidential\/sensitive information before sharing) That would make it easier to help. <\/p> I hope that helps!<\/p> Be safe, and have a fantastic weekend!<\/p> Best,<\/p> Andrée Starå<\/strong><\/a> | Workflow Consultant \/ CEO @ WORK BOLD<\/strong><\/a><\/p> ✅Did my post(s) help or answer your question or solve your problem? Please support the Community by <\/em>marking it Insightful\/Vote Up, Awesome, or\/and as the accepted answer<\/em><\/strong>. It will make it easier for others to find a solution or help to answer!<\/em><\/p>"}]}},"status":{"statusID":3,"name":"Accepted","state":"closed","recordType":"discussion","recordSubType":"question"},"bookmarked":false,"unread":false,"category":{"categoryID":321,"name":"Smartsheet Basics","url":"https:\/\/community.smartsheet.com\/categories\/smartsheet-basics%2B","allowedDiscussionTypes":[]},"reactions":[{"tagID":3,"urlcode":"Promote","name":"Promote","class":"Positive","hasReacted":false,"reactionValue":5,"count":0},{"tagID":5,"urlcode":"Insightful","name":"Insightful","class":"Positive","hasReacted":false,"reactionValue":1,"count":0},{"tagID":11,"urlcode":"Up","name":"Vote Up","class":"Positive","hasReacted":false,"reactionValue":1,"count":0},{"tagID":13,"urlcode":"Awesome","name":"Awesome","class":"Positive","hasReacted":false,"reactionValue":1,"count":0}],"tags":[{"tagID":219,"urlcode":"Sheets","name":"Sheets"},{"tagID":319,"urlcode":"functionality","name":"functionality"},{"tagID":437,"urlcode":"conditional-formatting","name":"Conditional Formatting"},{"tagID":439,"urlcode":"gantt-view","name":"Gantt View"}]},{"discussionID":108278,"type":"question","name":"How do you calculate the average number of days between a submitted date and a start date?","excerpt":"Additional context: We use Smartsheet to track support requests from the organization. We have an automated column that records the day the form is filled out. The form also has a date range of when they need their request completed by. I would like to calculate the average amount of days people provide from the day they…","snippet":"Additional context: We use Smartsheet to track support requests from the organization. We have an automated column that records the day the form is filled out. The form also has a…","categoryID":322,"dateInserted":"2023-07-28T20:36:42+00:00","dateUpdated":null,"dateLastComment":"2023-07-28T21:00:45+00:00","insertUserID":128090,"insertUser":{"userID":128090,"name":"Carlos Fernandez-Torres","url":"https:\/\/community.smartsheet.com\/profile\/Carlos%20Fernandez-Torres","photoUrl":"https:\/\/us.v-cdn.net\/6031209\/uploads\/defaultavatar\/nWRMFRX6I99I6.jpg","dateLastActive":"2023-07-28T21:30:09+00:00","banned":0,"punished":0,"private":false,"label":"✭✭"},"updateUserID":null,"lastUserID":45516,"lastUser":{"userID":45516,"name":"Paul Newcome","title":"","url":"https:\/\/community.smartsheet.com\/profile\/Paul%20Newcome","photoUrl":"https:\/\/us.v-cdn.net\/6031209\/uploads\/userpics\/082\/nQPUTVFKKWDJ2.jpg","dateLastActive":"2023-07-29T11:58:40+00:00","banned":0,"punished":0,"private":false,"label":"✭✭✭✭✭✭"},"pinned":false,"pinLocation":null,"closed":false,"sink":false,"countComments":3,"countViews":27,"score":null,"hot":3381156447,"url":"https:\/\/community.smartsheet.com\/discussion\/108278\/how-do-you-calculate-the-average-number-of-days-between-a-submitted-date-and-a-start-date","canonicalUrl":"https:\/\/community.smartsheet.com\/discussion\/108278\/how-do-you-calculate-the-average-number-of-days-between-a-submitted-date-and-a-start-date","format":"Rich","tagIDs":[254],"lastPost":{"discussionID":108278,"commentID":387924,"name":"Re: How do you calculate the average number of days between a submitted date and a start date?","url":"https:\/\/community.smartsheet.com\/discussion\/comment\/387924#Comment_387924","dateInserted":"2023-07-28T21:00:45+00:00","insertUserID":45516,"insertUser":{"userID":45516,"name":"Paul Newcome","title":"","url":"https:\/\/community.smartsheet.com\/profile\/Paul%20Newcome","photoUrl":"https:\/\/us.v-cdn.net\/6031209\/uploads\/userpics\/082\/nQPUTVFKKWDJ2.jpg","dateLastActive":"2023-07-29T11:58:40+00:00","banned":0,"punished":0,"private":false,"label":"✭✭✭✭✭✭"}},"breadcrumbs":[{"name":"Home","url":"https:\/\/community.smartsheet.com\/"},{"name":"Get Help","url":"https:\/\/community.smartsheet.com\/categories\/get-help"},{"name":"Formulas and Functions","url":"https:\/\/community.smartsheet.com\/categories\/formulas-and-functions"}],"groupID":null,"statusID":3,"image":{"url":"https:\/\/us.v-cdn.net\/6031209\/uploads\/QO67SBLMOJQA\/image.png","urlSrcSet":{"10":"","300":"","800":"","1200":"","1600":""},"alt":"image.png"},"attributes":{"question":{"status":"accepted","dateAccepted":"2023-07-28T21:01:27+00:00","dateAnswered":"2023-07-28T21:00:45+00:00","acceptedAnswers":[{"commentID":387924,"body":" =[End Date]@row - [Start Date]@row<\/p>"}]}},"status":{"statusID":3,"name":"Accepted","state":"closed","recordType":"discussion","recordSubType":"question"},"bookmarked":false,"unread":false,"category":{"categoryID":322,"name":"Formulas and Functions","url":"https:\/\/community.smartsheet.com\/categories\/formulas-and-functions","allowedDiscussionTypes":[]},"reactions":[{"tagID":3,"urlcode":"Promote","name":"Promote","class":"Positive","hasReacted":false,"reactionValue":5,"count":0},{"tagID":5,"urlcode":"Insightful","name":"Insightful","class":"Positive","hasReacted":false,"reactionValue":1,"count":0},{"tagID":11,"urlcode":"Up","name":"Vote Up","class":"Positive","hasReacted":false,"reactionValue":1,"count":0},{"tagID":13,"urlcode":"Awesome","name":"Awesome","class":"Positive","hasReacted":false,"reactionValue":1,"count":0}],"tags":[{"tagID":254,"urlcode":"Formulas","name":"Formulas"}]},{"discussionID":108269,"type":"question","name":"Dashboard Metric Breaks on Update of DataShuttle","excerpt":"I am sure there is something I am missing. But I try to set a Dashboard Matrix on a field that is refreshed by Data Shuttle. But when the Grid refreshes it breaks the Metric and says Data missing even though there is data in the field. Is there anyway around this or does Data Shuttle always break a Metric Cell?","snippet":"I am sure there is something I am missing. But I try to set a Dashboard Matrix on a field that is refreshed by Data Shuttle. But when the Grid refreshes it breaks the Metric and…","categoryID":321,"dateInserted":"2023-07-28T17:52:38+00:00","dateUpdated":null,"dateLastComment":"2023-07-28T22:21:10+00:00","insertUserID":164293,"insertUser":{"userID":164293,"name":"Joshua Jones","title":"IT Specialist","url":"https:\/\/community.smartsheet.com\/profile\/Joshua%20Jones","photoUrl":"https:\/\/us.v-cdn.net\/6031209\/uploads\/defaultavatar\/nWRMFRX6I99I6.jpg","dateLastActive":"2023-07-28T22:18:30+00:00","banned":0,"punished":0,"private":false,"label":"✭"},"updateUserID":null,"lastUserID":164293,"lastUser":{"userID":164293,"name":"Joshua Jones","title":"IT Specialist","url":"https:\/\/community.smartsheet.com\/profile\/Joshua%20Jones","photoUrl":"https:\/\/us.v-cdn.net\/6031209\/uploads\/defaultavatar\/nWRMFRX6I99I6.jpg","dateLastActive":"2023-07-28T22:18:30+00:00","banned":0,"punished":0,"private":false,"label":"✭"},"pinned":false,"pinLocation":null,"closed":false,"sink":false,"countComments":2,"countViews":32,"score":null,"hot":3381150828,"url":"https:\/\/community.smartsheet.com\/discussion\/108269\/dashboard-metric-breaks-on-update-of-datashuttle","canonicalUrl":"https:\/\/community.smartsheet.com\/discussion\/108269\/dashboard-metric-breaks-on-update-of-datashuttle","format":"Rich","tagIDs":[292,474],"lastPost":{"discussionID":108269,"commentID":387933,"name":"Re: Dashboard Metric Breaks on Update of DataShuttle","url":"https:\/\/community.smartsheet.com\/discussion\/comment\/387933#Comment_387933","dateInserted":"2023-07-28T22:21:10+00:00","insertUserID":164293,"insertUser":{"userID":164293,"name":"Joshua Jones","title":"IT Specialist","url":"https:\/\/community.smartsheet.com\/profile\/Joshua%20Jones","photoUrl":"https:\/\/us.v-cdn.net\/6031209\/uploads\/defaultavatar\/nWRMFRX6I99I6.jpg","dateLastActive":"2023-07-28T22:18:30+00:00","banned":0,"punished":0,"private":false,"label":"✭"}},"breadcrumbs":[{"name":"Home","url":"https:\/\/community.smartsheet.com\/"},{"name":"Get Help","url":"https:\/\/community.smartsheet.com\/categories\/get-help"},{"name":"Smartsheet Basics","url":"https:\/\/community.smartsheet.com\/categories\/smartsheet-basics%2B"}],"groupID":null,"statusID":3,"attributes":{"question":{"status":"accepted","dateAccepted":"2023-07-28T22:21:14+00:00","dateAnswered":"2023-07-28T20:45:34+00:00","acceptedAnswers":[{"commentID":387914,"body":" How exactly is your Data Shuttle set up? If it is set to replace everything in the sheet when it runs, it is deleting the cell being referenced by the widget and then putting new data in new cells.<\/p>"}]}},"status":{"statusID":3,"name":"Accepted","state":"closed","recordType":"discussion","recordSubType":"question"},"bookmarked":false,"unread":false,"category":{"categoryID":321,"name":"Smartsheet Basics","url":"https:\/\/community.smartsheet.com\/categories\/smartsheet-basics%2B","allowedDiscussionTypes":[]},"reactions":[{"tagID":3,"urlcode":"Promote","name":"Promote","class":"Positive","hasReacted":false,"reactionValue":5,"count":0},{"tagID":5,"urlcode":"Insightful","name":"Insightful","class":"Positive","hasReacted":false,"reactionValue":1,"count":0},{"tagID":11,"urlcode":"Up","name":"Vote Up","class":"Positive","hasReacted":false,"reactionValue":1,"count":0},{"tagID":13,"urlcode":"Awesome","name":"Awesome","class":"Positive","hasReacted":false,"reactionValue":1,"count":0}],"tags":[{"tagID":292,"urlcode":"Dashboards","name":"Dashboards"},{"tagID":474,"urlcode":"data-shuttle","name":"Data Shuttle"}]}],"initialPaging":{"nextURL":"https:\/\/community.smartsheet.com\/api\/v2\/discussions?page=2&includeChildCategories=1&type%5B0%5D=Question&excludeHiddenCategories=1&siteSectionID=0&sort=-hot&limit=3&expand%5B0%5D=all&expand%5B1%5D=-body&expand%5B2%5D=insertUser&expand%5B3%5D=lastUser&status=accepted","prevURL":null,"currentPage":1,"total":10000,"limit":3},"title":"Trending Posts","subtitle":null,"description":null,"noCheckboxes":true,"containerOptions":[],"discussionOptions":[]}">