Work Breakdown Structure (WBS) - Column Formula Configuration
Comments
-
Hi Lea, thks for your clarifications, i still have a quick Q. How could i edit, the "Task Duration Health Workdays" instead of 4 to 7 for example. I tried and there is no hidden column with that, even though the formula points to that field, how can i change it?, thks appreciated
-
Hi All,
Thanks to the team for this fantastic template. I love it but it doesn't fully cover my needs. I saw that when rows are deleted or indented the latter WBS number changes. Since we are using this WBS as the Case ID, it's important that the numbers don't change once assigned. Do you have any quick fix for that?
Essentially I want to make the parent WBS numbering to stay the same when a row before it gets deleted, e.g. row 6 and 7 -> 6 gets deleted, 7 should stay as 7 and not change to 6. The same with indentation, if I indent row 6 to become 5.1 I want 7 to remain 7 and not change to 6. Is it possible?
This way if the case ID is locked I should have them appear for the correct project name when someone sorts by any column in the sheet.
Thank you! :)